Frequently Asked Questions
What’s included in the plan set?
Core drawings
Foundation Plan
Floor Plans
Roof Plan
Elevations
Building Sections (or “Sections” — see note below)
Additions (option drawings)
Side Office Addition
Rear Addition Options
Rear ADU Addition
Rear Bedroom Addition
Details + schedules
Exterior Details
Window Schedule
What’s not included?
Structural engineering plans and calculations
Electrical plans
Plumbing plans
Mechanical/HVAC plans
Site/civil drawings (survey, grading/drainage, utilities, driveway/walks)
Septic or well design (if needed)
Permitting, zoning approvals, and local code coordination
Energy modeling or certifications (if pursuing net-zero/high performance)
Interior finishes, fixtures, and product selections
Cost estimating, material takeoffs, and contractor bids
Are there built examples I can see?
placeholder
Are these plans permit-ready? What will I need to get a permit?
placeholder
Can I build the Base House now and add the Side/Tail later?
placeholder
Can any licensed contractor build it using conventional methods?
placeholder
Can I customize the plans? What changes are common?
placeholder
Can it be net-zero / highly energy efficient? What determines that?
placeholder
What am I allowed to do with the plans after purchase?
placeholder
How do I receive the plans and what file format are they in?
placeholder
How do I find a contractor
placeholder